YMCA Orleans – Pool & Gymnasium Addition

Project Description

A new 1,950 m2 recreational facility including a six (6) lane swimming pool, shallow teaching pool, gymnasium, and change rooms.

The existing building’s change rooms, offices, reception, fitness areas and multi-purpose rooms were renovated.

Sustainable building features include low water consumption plumbing fixtures, total energy recovery wheel on the change room make-up air system, and an integral high efficiency gas fired heating plant serving both the building’s hydronic heating and domestic water heating loads.

The electrical systems included T5 high efficient lighting in the gymnasium.

Project Details

  • Owner: YMCA
  • Project Location:Ottawa, ON
  • Construction Completion:February 2011
  • Building Type:Recreation
  • Project Type:New Construction
  • Construction Value:$1.9M (M&E)